Environmental Review Documents
Resource reports
Resource Reports are prepared by the applicant for submittal to FERC to aid its preparation of an Environmental Impact Statement to fulfill the requirements of the National Environmental Policy Act. For this project, the applicant will be responsible for covering the following subjects in their resource reports: general project description; water use and quality; fish, wildlife, and vegetation; cultural resources; socioeconomics; geological resources; soils; land use, recreation, and aesthetics; air and noise quality; alternatives; and, reliability and safety. On January 13, 2012, the applicant filed the 11 draft resource reports. The applicant expects to finalize the resource reports in October 2012.
NOTE: The documents below are linked to FERC's e-library website. Should you have problems downloading a document, please try again at a later time. If you are still having problems downloading a document, contact us.
Draft Resource Report 1 – General Project Description
– RESOURCE REPORT 1, MAIN DOCUMENT – GENERAL PROJECT DESCRIPTION
Resource Report 1 - File 1 of 1 (1.6 MB, 104 pages)
– APPENDIX 1A - U.S. GEOLOGICAL SURVEY TOPOGRAPHIC-BASED ROUTE CORRIDOR MAPS
Appendix 1A - File 1 of 8 (8.3 MB, 40 pages)
Appendix 1A - File 2 of 8 (8.2 MB, 37 pages)
Appendix 1A - File 3 of 8 (8.3 MB, 27 pages)
Appendix 1A - File 4 of 8 (8.2 MB, 36 pages)
Appendix 1A - File 5 of 8 (8.4 MB, 30 pages)
Appendix 1A - File 6 of 8 (8.4 MB, 31 pages)
Appendix 1A - File 7 of 8 (8.5 MB, 37 pages)
Appendix 1A - File 8 of 8 (1.7 MB, 8 pages)
– APPENDIX 1B - FACILITY PLOT PLANS AND LOCATION MAPS
Appendix 1B - File 1 of 2 (8.4 MB, 58 pages)
Appendix 1B - File 2 of 2 (5.5 MB, 18 pages)
– APPENDIX 1C - HIGHWAY AND PIPELINE PROXIMITY TABLES
Appendix 1C - File 1 of 1 (254 KB, 2 pages)
– APPENDIX 1D - TABLE OF ADDITIONAL TEMPORARY WORKSPACE BY MILEPOST
Appendix 1D - File 1 of 1 (693 KB, 38 pages)
– APPENDIX 1E - TYPICAL DRAWINGS
Appendix 1E - File 1 of 1 (2.7 MB, 70 pages)
– APPENDIX 1F - PRELIMINARY TABLE OF NEW AND MODIFIED ACCESS ROADS
Appendix 1F - File 1 of 1 (1.5 MB, 76 pages)
– APPENDIX 1G - TABLE SUMMARIZING BORROW SITES
Appendix 1G - File 1 of 1 (328 KB, 6 pages)
– APPENDIX 1H - RATIONALE FOR THE WIDTH OF THE CONSTRUCTION AND PERMANENT RIGHT-OF-WAY
Appendix 1H - File 1 of 1 (1.03 MB, 16 pages)
– APPENDIX 1I - TABLE OF CONSTRUCTION RIGHTS‐OF‐WAY BY MILEPOST
Appendix 1I - File 1 of 1 (449 KB, 46 pages)
– APPENDIX 1J - ALASKA PIPELINE PROJECT’S EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN
Appendix 1J - File 1 of 1 (373 KB, 38 pages)
– APPENDIX 1K - ALASKA PIPELINE PROJECT’S WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES
Appendix 1K - File 1 of 1 (8.5 MB, 94 pages)
– APPENDIX 1L - AGENCY CORRESPONDENCE
Appendix 1L - File 1 of 10 (8.6 MB, 130 pages)
Appendix 1L - File 2 of 10 (8.6 MB, 157 pages)
Appendix 1L - File 3 of 10 (8.6 MB, 92 pages)
Appendix 1L - File 4 of 10 (8.5 MB, 10 pages)
Appendix 1L - File 5 of 10 (8.0 MB, 8 pages)
Appendix 1L - File 6 of 10 (8.4 MB, 10 pages)
Appendix 1L - File 7 of 10 (8.0 MB, 8 pages)
Appendix 1L - File 8 of 10 (8.0 MB, 8 pages)
Appendix 1L - File 9 of 10 (8.6 MB, 32 pages)
Appendix 1L - File 10 of 10 (1.6 MB, 21 pages)
– APPENDIX 1M - AFFECTED LANDOWNER NAMES AND ADDRESSES
Appendix 1M - File 1 of 1 (253 KB, 2 pages)
– APPENDIX 1N - SUMMARY OF STAKEHOLDER OUTREACH MEETINGS
Appendix 1N - File 1 of 1 ( 532KB, 10 pages)
– APPENDIX 1O - PRELIMINARY ALIGNMENT SHEETS
Appendix 1O - File 1 of 15 (8.5 MB, 29 pages)
Appendix 1O - File 2 of 15 (8.5 MB, 30 pages)
Appendix 1O - File 3 of 15 (8.2 MB, 29 pages)
Appendix 1O - File 4 of 15 (8.3 MB, 27 pages)
Appendix 1O - File 5 of 15 (8.2 MB, 21 pages)
Appendix 1O - File 6 of 15 (8.2 MB, 21 pages)
Appendix 1O - File 7 of 15 (7.9 MB, 25 pages)
Appendix 1O - File 8 of 15 (9.0 MB, 20 pages)
Appendix 1O - File 9 of 15 (8.0 MB, 17 pages)
Appendix 1O - File 10 of 15 (8.3 MB, 19 pages)
Appendix 1O - File 11 of 15 (8.5 MB, 21 pages)
Appendix 1O - File 12 of 15 (8.1 MB, 18 pages)
Appendix 1O - File 13 of 15 (8.3 MB, 18 pages)
Appendix 1O - File 14 of 15 (8.2 MB, 18 pages)
Appendix 1O - File 15 of 15 (7.2 MB, 19 pages)
Draft Resource Report 2 – Water Use and Quality
– RESOURCE REPORT 2, MAIN DOCUMENT – WATER USE AND QUALITY
Resource Report 2 - File 1 of 1 (1.7 MB, 66 pages)
– APPENDIX 2A - PRELIMINARY SPILL PREVENTION, CONTAINMENT, AND CONTROL PLAN
Appendix 2A - File 1 of 1 (278 KB, 6 pages)
– APPENDIX 2B - WATERBODIES CROSSED BY THE PIPELINE FACILITIES
Appendix 2B - File 1 of 1 (455 KB, 28 pages)
– APPENDIX 2C - WATERBODY CONCEPTUAL CROSSING DRAWINGS
Appendix 2C - File 1 of 3 (106 KB, 2 pages)
Appendix 2C - File 2 of 3 (8.82 MB, 1 page)
Appendix 2C - File 2 of 3 (3.9 MB, 1 page)
– APPENDIX 2D - PRELIMINARY INADVERTENT RELEASE OF DRILLING MUD PLAN
Appendix 2D - File 1 of 1 (341 KB, 12 pages)
– APPENDIX 2E - WETLANDS AFFECTED BY THE PROJECT
Appendix 2E - File 1 of 1 (3.1 MB, 374 pages)
– APPENDIX 2F - NATIONAL WETLAND INVENTORY MAPS
Appendix 2F - File 1 of 26 (7.2 MB, 20 pages)
Appendix 2F - File 2 of 26 (8.7 MB, 26 pages)
Appendix 2F - File 3 of 26 (7.6 MB, 24 pages)
Appendix 2F - File 4 of 26 (4.2 MB, 10 pages)
Appendix 2F - File 5 of 26 (6.1 MB, 10 pages)
Appendix 2F - File 6 of 26 (8.5 MB, 6 pages)
Appendix 2F - File 7 of 26 (6.2 MB, 4 pages)
Appendix 2F - File 8 of 26 (9.2 MB, 20 pages)
Appendix 2F - File 9 of 26 (8.7 MB, 14 pages)
Appendix 2F - File 10 of 26 (5.4 MB, 6 pages)
Appendix 2F - File 11 of 26 (6.9 MB, 6 pages)
Appendix 2F - File 12 of 26 (4.9 MB, 2 pages)
Appendix 2F - File 13 of 26 (7.8 MB, 4 pages)
Appendix 2F - File 14 of 26 (7.5 MB, 4 pages)
Appendix 2F - File 15 of 26 (5.9 MB, 6 pages)
Appendix 2F - File 16 of 26 (4.4 MB, 8 pages)
Appendix 2F - File 17 of 26 (7.8 MB, 8 pages)
Appendix 2F - File 18 of 26 (4.7 MB, 2 pages)
Appendix 2F - File 19 of 26 (7.5 MB, 4 pages)
Appendix 2F - File 20 of 26 (5.8 MB, 6 pages)
Appendix 2F - File 21 of 26 (8.8 MB, 6 pages)
Appendix 2F - File 22 of 26 (5.3 MB, 6 pages)
Appendix 2F - File 23 of 26(7.2 MB, 6 pages)
Appendix 2F - File 24 of 26 (4.5 MB, 12 pages)
Appendix 2F - File 25 of 26 (6.8 MB, 20 pages)
Appendix 2F - File 26 of 26 (3.9 MB, 12 pages)
– APPENDIX 2G - OUTLINE OF STORMWATER POLLUTION PREVENTION PLAN
Appendix 2G - File 1 of 1 (260 KB, 6 pages)
Draft Resource Report 3 – Fish, Vegetation, and Wildlife Resources
– RESOURCE REPORT 3, MAIN DOCUMENT – FISH, VEGETATION, AND WILDLIFE RESOURCES
Resource Report 3 - File 1 of 1 (2.9 MB, 178 pages)
– APPENDIX 3A - SEASONAL FISH DISTRIBUTION IN THE STREAMS CROSSED BY THE PROJECT
Appendix 3A - File 1 of 1 (355 KB, 18 pages)
APPENDIX 3B - APPLICANT-PREPARED ESSENTIAL FISH HABITAT ASSESSMENT
Appendix 3B - File 1 of 1 (271 KB, 2 pages)
– APPENDIX 3C - VEGETATION IMPACTS
Appendix 3C - File 1 of 1 (409 KB, 18 pages)
– APPENDIX 3D - APPLICANT-PREPARED BIOLOGICAL ASSESSMENT
Appendix 3D - File 1 of 1 (277 KB, 2 pages)
– APPENDIX 3E - RAPTOR NEST LOCATION MAPPING
Appendix 3E - File 1 of 1 (277 KB, 2 pages)
– APPENDIX 3F - MIGRATORY BIRD CONSERVATION PLAN
Appendix 3F - File 1 of 1 (281 KB, 2 pages)
Draft Resource Report 4 – Cultural Resources
– RESOURCE REPORT 4, MAIN DOCUMENT – CULTURAL RESOURCES
Resource Report 4 - File 1 of 1 (822 KB, 18 pages)
– APPENDIX 4A - OUTLINE OF CULTURAL RESOURCES AND HUMAN REMAINS COMPONENT OF CONSTRUCTION UNANTICIPATED DISCOVERIES PLAN
Appendix 4A - File 1 of 1 (277 KB, 4 pages)
– APPENDIX 4B - SUMMARY OF ALASKA NATIVE ORGANIZATION AND GROUP CONSULTATIONS
Appendix 4B - File 1 of 1 (271 KB, 4 pages)
– APPENDIX 4C - CULTURAL RESOURCES AFFECTED BY THE ALASKA PIPELINE PROJECT
Appendix 4C - File 1 of 1 (278 KB, 8 pages)
– APPENDIX 4D - 2010 CULTURAL RESOURCE FIELD STUDY RESULTS
Appendix 4D - File 1 of 1 (257 KB, 2 pages)
– APPENDIX 4E - ETHNOGRAPHIC STUDY
Appendix 4E - File 1 of 1 (258 KB, 2 pages)
Draft Resource Report 5 – Socioeconomics
– RESOURCE REPORT 5, MAIN DOCUMENT – SOCIOECONOMICS
Resource Report 5 - File 1 of 1 (1.2 MB, 106 pages)
– APPENDIX 5A - DETAILED TABLES
Appendix 5A - File 1 of 1 (794 KB, 58 pages)
– APPENDIX 5B - TECHNICAL MEMORANDUM - GEOGRAPHIC AND TEMPORAL SCOPE OF SOCIOECONOMIC ANALYSIS
Appendix 5B - File 1 of 1 (1.7 MB, 26 pages)
– APPENDIX 5C - TECHNICAL MEMORANDUM - HISTORICAL OVERVIEW OF THE ALASKA ECONOMY
Appendix 5C - File 1 of 1 (544 KB, 54 pages)
– APPENDIX 5D - TECHNICAL MEMORANDUM - MODEL ASSUMPTIONS AND REASONABLY FORESEEABLE FUTURE ACTIONS
Appendix 5D - File 1 of 1 (888 KB, 34 pages)
– APPENDIX 5E - SUBSISTENCE ANALYSIS FOR THE ALASKA PIPELINE PROJECT
Appendix 5E - File 1 of 9 (8.4 MB, 602 pages)
Appendix 5E - File 2 of 9 (8.4 MB, 42 pages)
Appendix 5E - File 3 of 9 (8.3 MB, 38 pages)
Appendix 5E - File 4 of 9 (8.3 MB, 48 pages)
Appendix 5E - File 5 of 9 (8.2 MB, 39 pages)
Appendix 5E - File 6 of 9 (8.3 MB, 41 pages)
Appendix 5E - File 7 of 9 (8.4 MB, 39 pages)
Appendix 5E - File 8 of 9 (8.4 MB, 50 pages)
Appendix 5E - File 9 of 9 (8.5 MB, 49 pages)
Draft Resource Report 6 – Geological Resources
– RESOURCE REPORT 3, MAIN DOCUMENT – GEOLOGICAL RESOURCES
Resource Report 6 - File 1 of 1 (2.8 MB, 62 pages)
– APPENDIX 6A - ACTIVE INDUSTRIAL MINERAL CLAIMS AND LEASES
Appendix 6A - File 1 of 1 (280 KB, 8 pages)
– APPENDIX 6B - OUTLINE OF BLASTING PLAN
Appendix 6B - File 1 of 1 (257 KB, 4 pages)
– APPENDIX 6C - SUMMARY OF PROBABLE AND POTENTIAL BLASTING LOCATIONS ASSOCIATED WITH PIPELINE FACILITIES TABLE
Appendix 6C - File 1 of 1 (302 KB, 16 pages)
– APPENDIX 6D - OUTLINE OF THE SIGNIFICANT PALEONTOLOGICAL RESOURCES COMPONENT OF CONSTRUCTION UNANTICIPATED DISCOVERIES PLAN
Appendix 6D - File 1 of 1 (258 KB, 4 pages)
Draft Resource Report 7 – Soil Resources
– RESOURCE REPORT 7, MAIN DOCUMENT – SOIL RESOURCES
Resource Report 7 - File 1 of 1 (5.3 MB, 75 pages)
– APPENDIX 7A - SUMMARY AND MILEPOSTED DATA TABLES BASED ON TERRAIN MAPPING
Appendix 7A - File 1 of 1 (1.7 MB, 228 pages)
– APPENDIX 7B - SUMMARY AND MILEPOSTED DATA TABLES BASED ON STSTSGO2 SOIL MAPPING
Appendix 7B - File 1 of 1 (700 KB, 30 pages)
Draft Resource Report 8 – Land Use, Recreation, and Aesthetics
– RESOURCE REPORT 8, MAIN DOCUMENT – LAND USE, RECREATION, AND AESTHETICS
Resource Report 8 - File 1 of 1 (4.9 MB, 91 pages)
– APPENDIX 8A - LAND USE AND OWNERSHIP AFFECTED BY CONSTRUCTION AND OPERATION OF THE PIPELINE FACILITIES BY MILEPOST
Appendix 8A - File 1 of 1 (330 KB, 12 pages)
– APPENDIX 8B - LAND USE AND OWNERSHIP AFFECTED BY CONSTRUCTION AND OPERATION OF ADDITIONAL TEMPORARY WORKSPACE AREAS
Appendix 8B - File 1 of 1 (1.4 MB, 166 pages)
– APPENDIX 8C - LAND USE AND OWNERSHIP AFFECTED BY CONSTRUCTION AND OPERATION OF BORROW SITES
Appendix 8C - File 1 of 1 (33 KB, 10 pages)
Draft Resource Report 9 – Air and Noise Quality
– RESOURCE REPORT 9, MAIN DOCUMENT – AIR AND NOISE QUALITY
Resource Report 9 - File 1 of 1 (2.5 MB, 56 pages)
– APPENDIX 9A - SAMPLE EMISSION CALCULATIONS
Appendix 9A - File 1 of 5 (1.7 MB, 216 pages)
Appendix 9A - File 2 of 5 (792 KB, 28 pages)
Appendix 9A - File 3 of 5 (134 KB, 22 pages)
Appendix 9A - File 4 of 5 (523 KB, 8 pages)
Appendix 9A - File 5 of 5 (182 KB, 24 pages)
Draft Resource Report 10 – Alternatives
– RESOURCE REPORT 10, MAIN DOCUMENT – ALTERNATIVES
Resource Report 10 - File 1 of 1 (8.1 MB, 76 pages)
– APPENDIX 10A - ROUTE MAPS COMPARING ROUTE VARIATIONS TO THE PROPOSED ROUTE
Appendix 10A - File 1 of 1 (5.9 MB, 34 pages)
– APPENDIX 10B - DOCKING CONFIGURATION ALTERNATIVES
Appendix 10B - File 1 of 1 (1.5 MB, 8 pages)
Draft Resource Report 11 – Safety and Reliability
– RESOURCE REPORT 11, MAIN DOCUMENT – SAFETY AND RELIABILITY
Resource Report 11- File 1 of 1 (442 KB, 22 pages)
– APPENDIX 11A - OUTLINE OF FIRE PREVENTION AND SUPPRESSION
Appendix 11A - File 1 of 1 (246 KB, 4 pages)
– APPENDIX 11B - GTP ENGINEERING INFORMATION
Appendix 11B - File 1 of 1 (282 KB, 2 pages)
Preliminary Draft Resource Reports 1 and 10
In April 2011, the applicant submitted preliminary draft resource reports for the project description and alternatives. The draft resource reports above are revisions of these documents based on agency and public input, and are included here for archival purposes. The applicant provided a response to agency comments on the preliminary draft resource reports concurrent with the revised draft resource reports. These documents are provided below under the appropriate preliminary draft resource report.
Preliminary Draft Resource Report 1
– PRELIMINARY DRAFT RESOURCE REPORT 1 – PROJECT DESCRIPTION
Preliminary Draft Resource Report 1 (6.0 MB, 189 pages)
– APPENDIX 1A– U.S. GEOLOGICAL SURVEY TOPOGRAPHIC-BASED CORRIDOR MAPS
Preliminary Draft Resource Report 1 Appendix 1A (51.5 MB, 147 pages)
– PRELIMINARY DRAFT RESOURCE REPORT 1 – AGENCY COMMENTS AND APPLICANT RESPONSE
Preliminary Draft Resource Report 1 (107 KB, 26 pages)
Preliminary Draft Resource Report 10
– PRELIMINARY DRAFT RESOURCE REPORT 10 – ALTERNATIVES
Preliminary Draft Resource Report 10 (704 KB, 24 pages)
– PRELIMINARY DRAFT RESOURCE REPORT 10 – AGENCY COMMENTS AND APPLICANT RESPONSE
Preliminary Draft Resource Report 10 Comments and Response (31 KB, 7 pages)
Notice of intent for the Alaska Pipeline Project
The Federal Energy Regulatory Commission has issued a notice of intent to prepare an environmental impact statement for the natural gas pipeline project proposed by TransCanada and ExxonMobil (The Alaska Pipeline Project). This is the first formal step in the National Environmental Policy Act process. The notice of intent was published Aug. 5, 2011, in the Federal Register, the official journal of the U.S. government. The notice identifies a draft schedule for public scoping meetings, targeted to start in early 2012. The meeting dates and locations will be published at least a month in advance.
Notice of Intent - August 2011
– FEDERAL REGISTER NOTICE OF INTENT
Federal Register notice (194 KB, 4 pages)
– FERC ELIBRARY NOTICE OF INTENT
FERC e-library notice - (171 KB, 9 pages)
– FERC ELIBRARY NOTICE OF INTENT - ATTACHMENT 1 - ENVIRONMENTAL REVIEW PROCESS FLOWCHART
– FERC ELIBRARY NOTICE OF INTENT - ATTACHMENT 2 - APP GENERAL LOCATION MAP
– FERC ELIBRARY NOTICE OF INTENT - ATTACHMENT 3 - ENVIRONMENTAL REQUEST FORM
Attachment 3 (136 KB, 2 pages)

